Drum-Buffer-Rope Technique

The bottleneck is the “drum” connected by a “rope” to gating operation and allowing a “buffer” to protect the bottleneck.
It is the leverge point between the demand and the CCR that dictates the actual pace if the system.
It has to plan and control.



CCR(capacity constraint resource): when the demand approaches the limit imposed by the most loaded resource, that particular resource, in turn become CCR.